AEONIX_TRADE / SYSTEM_REPORT
WHEN-A-PSI-PASS-IS-NOT-A-SAFETY-CERTIFICATE
NOVEMBER 12, 2026/Suppliers & quality

When a PSI Pass Is Not a Safety Certificate

Aeonix Trade

Published by Aeonix Trade.

When a PSI Pass Is Not a Safety Certificate

A passed pre-shipment inspection closes the lot against the spec you agreed, on the sample the report names. It does not prove the goods may be sold. The document that does that job changes with the market: a signed declaration for the Union, a grant or a supplier declaration for a US radio, and the importer's children's certificate for a toy made abroad. As of 10 November 2026, 16 CFR 1110.7(a) puts that children's certificate on the importer when the goods were made outside the United States. The inspection cover fills none of those roles. Use the table to pick the file, then keep the inspection PDF beside it.

Boundary diagram: a PSI pass closes the spec and does not replace a CE declaration, an FCC grant, or the importer's children's product certificate.
Three files a pass does not replace. Rules as of 10 November 2026.

Send the destination and the product type so the order file lists the conformity document separately from the inspection.

Which file proves which market

Decision table: the document that carries compliance, as of 10 November 2026. A PSI pass is in none of these cells.
Market questionDocument that answers itWhere to read the rule
Union markingSigned declaration and the technical file, kept at least 10 yearsCE marking for products from China. The maker or the authorised representative affixes the mark.
BritainThe mark Britain still recognises, or the British mark, plus the file that page requiresGOV.UK page updated 21 August 2026. The label option runs until 11pm on 31 December 2027.
US radioSupplier declaration, or a grant tied to the tested sampleFCC rules for electronics made in China
Children's product made outside the United StatesChildren's Product Certificate issued by the importerCPSC rules for children's products from China. 16 CFR 1110.7(a).
If you cannot name a row, do not describe the inspection as approval. How to read the report itself is a separate page: how to read a pre-shipment report.

This table does not say your storage box needs every row. A box with no radio and no children's marketing may have no FCC row and no CPC row. The test is whether you can name the rule for the market on the invoice. When a row needs a measurement, commission it against that rule, not against the inspection cover.

The CE technical file is kept for 10 years, separate from a pre-shipment pass.
Your Europe's 10-year retention applies to the declaration, not to the inspection cover.

What buyers ask

Can I send the PSI report as the CE certificate?

No. Article 30 describes the manufacturer's indication of conformity. The report describes a sample and a lot.

The workmanship passed. Is a lab still open?

Only if a rule you have opened for that market requires a test, a declaration, or a grant. The inspection did not perform that step. If you cannot name such a rule, say so, and do not invent a test to fill the folder.

Put the market and the product on the RFQ if the conformity row should be listed next to the inspection, not instead of it.

Sources

You’re leaving Aeonix Trade

This link opens a third-party website in a new tab. Check the destination before continuing; its content and privacy practices are outside our control.

Submit sourcing request

Can't find what you need?

Start with a product or image link, an approximate quantity and destination. Other details can follow.